
CGEO tiltsensor helps the monitoring application of Tower 116 of Shanxi Oil and Gas Pipeline-October 2019
CGEO has successfully completed the installation service of monitoring instruments for tower No.116 of Shanxi oil and gas pipeline to realize the tilt of tower No.116 and the monitoring of surrounding geological landslide risk. The monitoring equipment includes biaxial tiltsensor supporting power supply acquisition and communication system and GNSS
CGEO won the order of passenger Terminal and Comprehensive Transfer Center of Beijing New Airport-January 2019
CGEO and Beijing Urban Construction Group Co., Ltd. signed the purchase order for intelligent wireless temperature measuring system equipment of Beijing New Airport Passenger Terminal and Comprehensive Transfer Center Project (core area). Provide intelligent wireless temperature measuring system equipment, including intelligent terminal, datalogger and temperature sensor and other temperature measuring system equipment.
CGEO won the bid of Dongguan Juzhengyuan Propane low temperature storage tank-April 2017
CGEO won the bid of Dongguan Juzhengyuan propane low temperature storage tank horizontal inclinometer system. We provided the required instruments and services on time in accordance with the requirements of the Tenderee.
Supply and training of Yuzhou Management Office, Middle Route of South-to-North Water Diversion Project completed-October 2016
CGEO completed the supply, installation and debugging of the oblique meter to the Yuzhou Management Office of the middle route of the South-to-North Water Diversion Project
The main project of the radio telescope FAST was successfully completed. -July 2016
As the main supplier of safety monitoring instruments for FAST project, CGEO has fully participated in the health monitoring service of the steel structure and the construction and operation period of FAST project, escorting the safe construction of FAST project!